Lane Block 04 · Data Hall
The data hall, delivered White Space Ready. Varying rack densities and tenant fit-out absorbed without major design changes.
Century Mission Critical holds the general contract: site, civil, structure and white space.
Credential
980 MW delivered and under construction.
Engineered once, built and commissioned in the factory, then repeated on every 5 MW lane of the campus.