Hypergate
Overview The 5 MW Lane 01Generator 02Power 03Space Cooling 04White Space 05Air-Cooled Chiller Plant How We Build Delivered Team Careers Contact
← Back to the lane Lane block 02 of 05

Lane Block 02 · Critical Power

Power

The lane’s electrical backbone: UPS, distribution, fire suppression, and cooling, integrated into one factory-built power block and commissioned L1 to L3 on skids before it ships, from L1 factory acceptance through systems handover.

Plan view of one 5 MW Hypergate lane: generator, power, space cooling and white space in a row on a common slab, with the air-cooled chiller plant outside the lane at the end

Block 02 of 05 on the lane plan

Block Specification

In the lane 2 power skids · 2 switchboard lineups
Where it sits One bay per lane, every bay built the same
In the block UPS, distribution, fire suppression, and cooling, tested as a unit
Commissioning L1–L3 on skids in the factory
Site electrical labor 62–70% less than a conventional build
Schedule saved 8–10 months, groundbreaking to integrated systems test

Built by Mission Critical Group

MCG designs, manufactures, and services critical-power systems, built to meet the strain electrification puts on infrastructure.

  • Modular power blocks (MCPU) with integrated UPS and distribution.
  • Low- and medium-voltage switchgear, configured to order.
  • 62–70% less site electrical labor; 8–10 months of schedule saved.

Credential

U.S. manufacturing, engineering through aftermarket service, on industry-standard components.

UPS lineup and switchboards inside a factory-built power block
Inside a power module: UPS lineup and switchboards, factory-tested as one block.

Engineered once, built and commissioned in the factory, then repeated on every 5 MW lane of the campus.

← Generator Space Cooling →

Contact

Tell us the capacity you need and the date you need it running.

Contact Hypergate