Delivered

The firms behind Hypergate have 980 MW delivered and under construction across three North Dakota campuses, from digital-currency hosting to liquid-cooled AI. Seven consecutive builds for one client, each carried by the same firms that build the lane.

Project Campus Capacity Workload Status
JMS 01 Jamestown 100MW Digital-currency hosting Energized
ELN 01 Ellendale 180MW Digital-currency hosting Energized
ELN 02 Ellendale 100MW Liquid-cooled AI site, core & shell Energized
ELN 03 Ellendale 150MW Liquid-cooled AI site, core & shell Complete
ELN 04 Ellendale 150MW Liquid-cooled AI site, core & shell Complete
FAR-01 Harwood 150MW Liquid-cooled AI site, core & shell Complete
FAR-02 Harwood 150MW Liquid-cooled AI site, core & shell Under construction

280 MW digital-currency hosting, 700 MW liquid-cooled AI. General contract on all seven builds: Century Mission Critical.

The Campuses

Aerial view of the Jamestown hosting campus: long metal-roofed buildings in two ranks on flat prairie, sidewall exhaust fans down the flanks, transformer yard at the edge of the site
Jamestown. JMS 01100 MW
Ellendale campus mid-build: rooftop mechanical units set across the white membrane roof, crawler cranes at the precast wall line, substation and switchyard beyond
Ellendale. ELN 01–04580 MW
Harwood campus mid-build: precast wall panels erected and roofs decked on two buildings, crawler cranes working the line, racked precast panels in the laydown yard
Harwood. FAR-01 and FAR-02300 MW

Cold-Climate Execution

The record was set where the construction season is short and the winters are hard. Enclosure goes up early, trades move inside, and the schedule holds.

UPS cabinets and a switchgear lineup installed indoors, cable tray and conduit overhead
Critical power, indoors
Aerial render of a Hypergate lane campus at dusk
Hypergate lane campus at dusk, render